Hebei Hengguang Conveying Machinery Manufacturing Co., Ltd.
Home > PROJECTS

Nigerian Customers

PROJECTS:

In 2017, at the request of Nigerian customers, we tailored the belt conveyor specially designed for stone mining to the current position and operated for 2 years without any malfunction.

inquire Now

Product Information

In 2017, at the request of Nigerian customers, we tailored the belt conveyor specially designed for stone mining to the current position and operated for 2 years without any malfunction.

Before the belt conveyor runs, first confirm that the belt conveyor equipment, personnel, and articles being transported are in perfect condition; secondly, check that the moving parts are normal and free of foreign matter, check that all electrical circuits are normal, and that the belt conveyor can be put into operation normally. . Finally check that the difference between the supply voltage and the rated voltage of the device does not exceed ± 5%.